Saturday, June 7, 2014
Open Meeting:
10:00am at Longbranch Fire Station
Owners present:
7 community members
Taylor Bay Beach Club
Board Meeting Minutes
Board Members present:
Steve Stemhagen (President)
Sue Hannah (Vice President) Alice Carey (Treasurer & Secretary (temp) Wilbur Dukes; Karen Ekdahl
Board Members absent:
Harold Mattoon
Call to Order
Approval or Correction of 4/25/14 minutes
•
Minutes approved.
Treasurer’s Report
NCOME
an to
oday)
013 Dues
013
pecial
ssessment
014 Dues
014 Beach
.A.
014 Road
.A.
015
repaid
ues
ompliance
nes
egal
eimburse
ent
ien
elease
on-
ompliance
imbursem
nt
1,968.14
477.50
82,365.00
3,400.00
1,700.00
334.68
1,947.19
874.98
73.00
21.84
Total
income
93,162.33
anking
formation as
f 6/5/14
Key Bank
(checking)
SCU
(checking)
Total
60,184.88
11,435.35
71,620.23
-6,361.50
2013 Special Assessment Balance to use
I
(J
t
2
2
S
A
2
2
S
2
S
2
P
D
C
F
i
L
R
m
L
R
N
c
re
e
B
In
o
-1,700.00
60,158.73
Key Bank
(savings)
SCU (Road
Fund)
19,897.12
7,267.01
2014 Beach
assessment
2014 Road
assessment
Operating
Budget
-3,400.00
XPENSES
to 5/31/14)
Accountant
Beach Repairs
Sanican
Water/Sewer
Tech
Facilities
Rental
Gate
Maintenance
Insurance
Landscape
Svcs
Legal
Misc supplies
Office
supplies
Property
Tax/Licenses
Utilities
Water/Sewer
Maint
To Road
Repairs
To Savings
3,176.74
1,531.69
(from operating capital)
153.00
12,500.00
130.00
1,753.32
4,493.00
3,238.75
2,400.00
102.84
436.70
2,338.22
2,736.28
4,243.90
1,200.00
2,431.62
42,866.06
embers owing:
11 members on DUES payment plans still owing:
1 member in collections for past/present Dues
2 properties in foreclosure (will collect when sold)
1 member (2 properties) in legal
proceedings
2
members in property tax
foreclosures
President’s Report/Old Business
Beach Repairs
Building Permit applied for at Pierce County for beach bulkhead.
$1,081.69 fee paid. We had to include the landscape design of the plantings
reviewed sometime mid-July.
with this application. Our application will be
A packet of required documents will also be mailed to the Fish & Wildlife Dept for their review in order to receive our hydrolic
permit. We received a bid from Island Rock & Water to build the bulkhead and soft-armoring for $53,000. We will be getting 2 more
bids. The landscaper’s bid for the plantings and labor was $3700. We will get 2 more bids for this, also. Charbonneau will also be
E
(
M
Facilities Manual
Our manual will be completed by the end of this month.
Tree removal
There are 2 dead fir trees in our park, a couple of trees along the beach road hill and 2 trees (and possibly more) located over one of
our main sewer lines @ Larsen’s that need to be cut down. Steve will get a bid for this work.
Also there are some tree branches hanging out over our roads that need trimming.
asked for a bid for the bulkhead/soft-armoring work. An irrigation system of some sort (garden hoses, etc) will be needed to water the
new plantings until they are established.
Rental restriction policy
We will need to draft a policy (a possible By-law vote) and have attorney review it. A future meeting will be scheduled.
Road Repairs
We inspected our road with Mike from Northern Asphalt and he has submitted a bid for $20,727.59. He did not raise his square foot
price from previous work done for us. The areas have been marked with bright pink paint. This will probably be scheduled sometime
in September after special assessment has been collected.
Sewer Plant upgrades
UV shed construction will be started soon. Steve will speak with Marty about re-coating our tanks and possibly replacing anodes. We
might need to use an excavator to dig and locate the anodes.
Water System
We will need to take inventory of each neighbor’s water meter to allow time
for purchasing and installation of any meters
missing in order to meet the
DOH
2017 compliance deadline of annual meter readings.
NEW BUSINESS
Illegal burning, including garbage. Any illegal burning noticed by anyone in
Dept, not the Board. Fines will be levied by the Fire Dept. for such illegal action.
our community should be reported to the Fire
Water line issue @ Forkner’s
His water line is clogged between TBBC 8” water line and the 1” water line
it.
to his meter. Arrangements are being made to fix
New security system update
Steve will contact a company for the cost of a large security steel box.
Further investigation needed for new camera surveillance.
All system water flushing
An all-system water flush (including all fire hydrants) will occur sometime after the 4th of July weekend. Notices & emails will be
posted. Be sure to
turn on your outside faucet to clean out your line to your home after the flushing has been completed.
Theft
Al Hazelquist reported that his boat anchor, line and chain were stolen last week.
Speed Bump Rock
Approval given to the Thompsons to place a rock on the right-of-way beside
on the grass.
the speed bump in order to curtail “drive arounds”
Calendar
th
The next Board Meeting will take place on July 12 and 10:00am at the beach cabana.
Meeting Adjourned.
Closed Executive session
Delinquent Accounts
Legal Matters
Non-compliance issues/fines